CBAM Defaults
cbam/malaysia/cement

Malaysia · Cement

CBAM default values

6 products with official default emission values. Total embedded emissions range 0.91 to 1.47 tCO2e per tonne of product.

SourceImplementing Reg (EU) 2025/2621·values dated 4 Feb 2026·informational, not legal adviceView official EU file
Year
Calculate exposure for these
CN codeHS codeDescriptionproductDirecttCO2e/tIndirecttCO2e/tTotaltCO2e/t2026tCO2e/t2027tCO2e/t2028tCO2e/tRouteproduction
2523 90 00White hydraulic cements1.290.181.471.621.761.91(B)
2523 21 00White Portland cement1.260.141.401.541.681.82
2523 10 00White clinker1.290.061.341.471.611.74(B)
2523 29 00Grey Portland cement0.870.070.951.041.141.24
2523 90 00Grey hydraulic cements0.830.080.911.001.091.18(A)
2523 10 00Grey clinker0.870.040.911.001.091.18(A)
Carbon intensity (tCO2e/t)lowmoderatehighvery high2026–2028 add 10% / 20% / 30% markup6 rows · 0.911.47

Estimate your exposure

Pick a product, enter your annual export volume, and see the estimated CBAM certificate cost using the default value.

tonnes

Assumes EU ETS price €88/tCO2e and the 2026 certificate obligation share of 2.5%.

2523 90 00 · White hydraulic cementslow
Estimated CBAM certificate cost, 2026€28,45912,936 certificates · 12,936 tCO2e embedded
default value1.47 tCO2e/t
with verified actualssave €4,269€8,538

Default values are deliberately conservative. Most producers who report their own verified emissions land 15 to 30% below the default, which lowers the certificates they must surrender. Download the supplier data template.

copies a link